Baicheng Zhenlai Transformer Co., Ltd. Plant Engineering Reconstruction Project

2024-09-29


The factory building of Baicheng Zhenlai Transformer Co., Ltd. has a steel structure with a construction area of 65000 ㎡, a height of 36m, and a temperature standard ≥ 16 ℃ 1 ℃. The total cost of coal and electricity for operation throughout the year is 1.1 million yuan, and the heating cost per square meter is 17 yuan (about 65 yuan for regular factory building). The factory building of Baicheng Town Lai Transformer Co., Ltd. uses more than 430 sets of equipment (GC-30BG, GC-16BG, GC-28MC-LZ/DZ, ZSQ-8L-BG03)


The factory building of Baicheng Zhenlai Transformer Co., Ltd. has a steel structure with a construction area of 65000 ㎡, a height of 36m, and a temperature standard ≥ 16 ℃ 1 ℃. The total cost of coal and electricity for operation throughout the year is 1.1 million yuan, and the heating cost per square meter is 17 yuan (about 65 yuan for regular factory building).

The factory building of Baicheng Town Lai Transformer Co., Ltd. uses more than 430 sets of equipment (GC-30BG, GC-16BG, GC-28MC-LZ/DZ, ZSQ-8L-BG03)