Heating Investment and Operation Project of AVIC Shenfei Civil Aircraft Co., Ltd.

2024-09-11


The A01 workshop of AVIC Shenfei Civil Aircraft Co., Ltd., a heating investment and operation project of AVIC Shenfei Civil Aircraft Co., Ltd., has a construction area of 20000 ㎡, a height of 18m, adopts steam heating mode, and the terminal equipment is steel pipe radiator, heater, air curtain, etc. The leakage of equipment and pipelines is serious, resulting in a large amount of energy waste. After the transformation, the water supply temperature is 65 ℃, the return water temperature is 50 ℃, and the indoor average temperature is above 19 ℃, which meets the indoor target temperature requirements, and the energy saving rate is as high as 40%. AVIC Shenyang Aircraft Co., Ltd. uses over 160 pieces of equipment (GC-30BG, GC-16BG, GC-28MC-LZ/DZ, ZSQ-8L-BG03)


The A01 workshop of AVIC Shenfei Civil Aircraft Co., Ltd., a heating investment and operation project of AVIC Shenfei Civil Aircraft Co., Ltd., has a construction area of 20000 ㎡, a height of 18m, adopts steam heating mode, and the terminal equipment is steel pipe radiator, heater, air curtain, etc. The leakage of equipment and pipelines is serious, resulting in a large amount of energy waste. After the transformation, the water supply temperature is 65 ℃, the return water temperature is 50 ℃, and the indoor average temperature is above 19 ℃, which meets the indoor target temperature requirements, and the energy saving rate is as high as 40%.

AVIC Shenyang Aircraft Co., Ltd. uses over 160 pieces of equipment (GC-30BG, GC-16BG, GC-28MC-LZ/DZ, ZSQ-8L-BG03)