Service Content
- Product Description
-
Implementation of the Project
STEP
Initial design of project scheme
STEP
Energy-saving benefit sharing
STEP
Site Survey, Energy Use Assessment
Through the realization of field investigation, understand the situation on the spot.
Analyze and evaluate whether the energy utilization of the investment project is scientific and reasonable.
Negotiation and signing of contract
STEP
System operation and maintenance service
Negotiate and sign the contract and refine the design plan.
02
03
04
According to the requirements of the project plan, the project is implemented on site.
According to the contract agreement to carry out a package of heating operation and maintenance services.
05
01
06
tall space heating engineering services:
Through professional design and heating engineering services, the equipment operation system has no temperature gradient change, eliminating the heat consumption of the envelope height, saving initial investment, reducing operating costs and energy consumption.
Large space heating investment operation and maintenance services:Through professional design and heating engineering services, the equipment operation system has no temperature gradient change, eliminating the heat consumption of the envelope height, saving initial investment, reducing operating costs and energy consumption. Provide customers with integrated heating energy-saving services and complete heating energy-saving solutions, and implement a package of specialized heating energy-saving services for customers; while meeting the heating needs of customers, achieve the energy-saving amount or energy-saving benefits agreed with customers.
Service Content
Share energy-saving results with customers to achieve win-win goals.
According to the results of the site survey, the implementation scheme of the project is designed.
STEP
STEP
Key words:
Related Products
Get Quote